City of Collinsville

106 N 12th Street

PO Box 730

Collinsville, OK 74021

(918) 371-1010 Phone

(918) 371-1019 Fax

Slide 3 Slide 4 Slide 5 Slide 6 Slide 7 Slide 8 Slide 9

Collinsville News and Information

NOTICE TO PUBLIC:  Phase I construction will begin July 5, 2016 to replace the bridge located on 19th Street (by City park south of Spring Street).   Local Traffic Only will be allowed access to 19th Street while construction is being done.  The official detour will direct motorists to use 12th Street for north/south passage between Main Street (HWY 20) and 136th Street North. 

Phase II to replace the bridge located on 12th Street (by the day care center south of South Street) will begin upon completion of Phase I.  Local Traffic Only will be allowed access to 12th Street while construction is being done.  The official detour will direct motorists to use 11th and 13th Streets for north/south passage between South Street and Plum Street.

The two bridge replacement projects are estimated to take approximately 130 days from start to completion.  The public is asked to comply with all local traffic laws and posted detour signs until this project is complete.  Your cooperation while construction proceeds is much appreciated.